Services

The Process

I follow the RIBA Plan of Work, providing guidance from the first conversation through to completion and beyond. But WHAT DOES THIS MEAN

Stage 0 | Initial Consultation

Call or email to discuss your ideas.

As part of this initial conversation, I will carry out preliminary planning checks and provide honest advice on the potential opportunities and constraints of your project.

Stage 1 | Preparation & Brief

This stage includes:

Site or measured surveys // Research into planning constraints // Understanding how you live and use your home // Developing a detailed project brief tailored to your needs

Stage 2 | Concept Design

The feasibility stage, where we explore different design possibilities through 2D drawings and 3D modelling. Testing spatial arrangements while assessing indicative construction costs. Once a preferred option has been selected, we progress to planning.

Stage 3 | Planning

The chosen design is developed further, refining materials, spatial relationships and key architectural elements. Planning applications often require a Design and Access Statement outlining:

Site context // Heritage considerations // Planning constraints // Design rationale // Visual impact

Depending on the project, we may work alongside planning consultants, engineers, surveyors and other specialist consultants to support the application.

Stage 4A | Technical Design

Once planning approval is secured, the project is fully developed into a coordinated technical package. This includes:

Plans, elevations and sections // Detailed 3D modelling // Internal elevations // Visualisations of key space // Detailed construction drawings // Schedules for Kitchen, Bathroom, Finishes, Doors, Windows

We coordinate information from structural engineers, M&E engineers, AV consultants and other specialists to ensure contractors can accurately price the work and minimise unexpected costs during construction.

The completed package is then issued to selected contractors for tender.

Stage 4B | Technical Design Review

Once contractor pricing is received, we review each proposal together.

We compare costs, identify areas that may require adjustment, and refine the design where necessary before issuing the final Construction Issue drawing package for construction and Building Control approval.

Stage 5 | Construction

Throughout the build, I provide ongoing support through regular site visits, coordination meetings and contractor liaison. Early-stage reviews often include:

Structural steelwork // Window systems // Specialist installations // Joinery design // Finishes and materials // Lighting // Window treatments // Final detailing

Towards completion, site visits become more frequent to ensure the finished result meets the required standard.

Stage 6 | Handover

Once construction is complete, you move into your new home. I will help ensure all required documentation is in place, including: Building Control certificates // Completion documentation // Relevant planning obligations and CIL requirements

Stage 7 | Handover & In Use

Most importantly, my involvement does not end when the project finishes.

If issues arise once you are living in your home, I remain available to help identify solutions and coordinate with the appropriate contractor or consultant where required.

FEES

Our fee typically ranges from 8–10% of the construction cost, depending on the scale of your project, and is split across the stages below. Call for an initial consultation to discuss which stages you would like our support with and how we can work within your budget.

Stages 0–1
10%
Stages 2–3
20%
Stage 4
30%
Stage 5
30%
Stages 6–7
10%